In a small Eskişehir restaurant, the same printed list has opened the kitchen every morning for 18 years: 47 items, 90 minutes, three stations. When the owner's son took over, the first thing he wanted to redesign was the list. He didn't — because it isn't only a control tool, it's a tempo metronome for new staff.
T-90 Minutes: Dining Room and Hygiene (1-18)
For an 11:00 opening, start at 09:30. The first 18 items belong to the floor team: chair count (32 units), tablecloth turnover, salt/pepper refill (minimum 1/3 full per table), napkin stock (8 per table), floor mopping, window cleaning, menu inspection (replace torn/stained copies), and QR-sticker legibility.
The hygiene sub-block is critical: soap level at every sink, paper-towel stock, disinfectant spray (measured in ml), and dry-floor test. Mark each item with a signature, never a verbal "done."
Kitchen Mise-en-Place (19-38)
Twenty items for the kitchen team: onion/garlic dicing (2 kg), broth stock, tomato paste opening, meat portioning (180-220g per plate), salad bowls prepped, sauce review (date + smell), grill cleanup, fryer-oil check (TPM ≤ 24%), fridge temperature (≤ 4°C), and freezer (≤ -18°C).
- Bread slicing (80 slices per service)
- Side-dish portioning (40 portions on standby)
- Dessert showcase arrangement with date labels
Last 30 Minutes: Systems and Briefing (39-47)
POS boot, cash float ($25 starter), daily menu screen, waiter-call button test, music level (60-65 dB), HVAC at 22°C, door-gap check. The very last item is always a 5-minute briefing: today's specials, 86'd items, reservation list, and any allergy-flagged guest. Service does not start without it.
Use the thMenu admin panel to push last-minute menu changes (out-of-stock, daily specials) with one tap — paper is the source of truth, the digital layer is the safety net on item #47.
FAQ
Is 47 items too many? Yes for week one, automatic by week three. It's a pedagogical tool for new staff.
Same list every day? No — the weekend variant is 51 items, with four extra for breakfast service.
Who signs off? The shift lead signs each block (floor/kitchen/systems) separately. Responsibility is unambiguous.
Found this helpful? Share it.
Related articles
The Complete Guide to Running a Multilingual Restaurant Menu
Serving international guests? Learn how to set up a menu that automatically spea…
What Is a QR Code Menu? The Complete Guide for Restaurants
A QR code menu lets customers access your full restaurant menu instantly on thei…
Understanding Your Restaurant's Data: A Practical Analytics Guide
Your menu generates data every day. Learn how to read it, act on it, and use it …